Although we have had a hiatus from conducting volunteer trips to the region, the progress on the orphanage project has no halted. We have continued to engage with local leaders and construction personnel with WhatsApp to assist with the progression of the project.

This year, 2020, work has been done to install insulation in the roofs that were installed over the course of 2017 and 2018. Additionally, we have begun progress to connect the orphanage to the local grid through the use of a recently purchased tree trunk that will connect the orphanage to the power lines originating from the main road.